Home > Archive > Architecture > March 2007 > Re: How Long to Tape / Mud / Sand Drywall ?









You are viewing an archived Text-only version of the thread. To view this thread in it's original format and/or if you want to reply to this thread please [click here]

 

Author Re: How Long to Tape / Mud / Sand Drywall ?
Pat

2007-03-26, 1:25 pm

On Mar 26, 11:57 am, Bob Morrison <SpamFigh...@junk.com> wrote:
> In a previous post Pat wrote...
>
>
> Doesn't mean you could not build it. The "direct supervision" law just
> means that no design professional could put his/her seal on that set of
> drawings.
>
> An architect/engineer could completely redraw the drawings under their own
> title block/logo and then seal those drawings. Any responsible A/E would
> only do so after completely checking the design.
>
> --
> Bob Morrison, PE, SE
> R L Morrison Engineering Co
> Structural & Civil Engineering
> Poulsbo WA
> bob at rlmorrisonengr dot com


What a fundimentally stupid law. You can take a set of plans and send
it over to a drafting shop and have them redraw it for you and email
you the file so you can print it, but you cannot "buy" an identical
set of plans where the original drawer emails you the exact same
building. Does that strike you as weird?

LinkBot





Other archives available: Cellular phones topics archive | Web Design forum archive | Software help archive | Hardware reviews archive | Programming topics archive

Copyright 2004 - 2008 homeownerschat.com