Home > Archive > Building and Construction > September 2005 > Concrete Slab Question









You are viewing an archived Text-only version of the thread. To view this thread in it's original format and/or if you want to reply to this thread please [click here]

 

Author Concrete Slab Question
Andy Asberry

2005-09-27, 9:21 pm

This is on a farm; no inspections of any type. I have a 8'x8'x6" slab
that I had a feed bin on (now gone). The leg anchors (4) of the bin
were 6 feet on a side. In other words, one foot in from each edge of
the slab. Where the anchor bolts for the legs are there is an 8" pier
4' deep. There is no perimeter beam. #3 rebar on 12".


What I want to do is build a block building 8' high, pour a flat 4"
roof and place a 1500 gallon water storage tank on top. The building
would house the pressure pump and tank. I would fill the voids in each
corner and midway each wall. Top course would be U lintels with rebar.

I'm guessing the total weight at about 20,000#. The feed bin held
24,000# carried over the piers. The 8" blocks will be about flush with
the edge of the piers. Am I safe with the cantilever/shear of a 6"
slab with that weight?
Bobk207

2005-09-28, 5:21 am

Where is this structure located?

I would dowel in to the slab with steel for the wall & consider
grouting more often than 48".

You should get a civil to take a look at it but IMO the feed bin
condition was worse for the slab than your proposed pump / storage
building

cheers
Bob

Bob Morrison

2005-09-28, 12:21 pm

In a previous post Andy Asberry wrote...
> I'm guessing the total weight at about 20,000#. The feed bin held
> 24,000# carried over the piers. The 8" blocks will be about flush with
> the edge of the piers. Am I safe with the cantilever/shear of a 6"
> slab with that weight?
>


The answer depends on your location. If in a high seismic zone or an area
where the frost depth is high then the 6" slab may not be sufficient.

AS Bob K suggested, you might want to have an engineer take a quick look
at the issue just to satisfy yourself that the structure will be safe.

--
Bob Morrison, PE, SE
R L Morrison Engineering Co
Structural & Civil Engineering
Poulsbo WA
Andy Asberry

2005-09-28, 6:21 pm

On 28 Sep 2005 00:20:55 -0700, "Bobk207" <rkazanjy@gmail.com> wrote:

>Where is this structure located?
>
>I would dowel in to the slab with steel for the wall & consider
>grouting more often than 48".
>
>You should get a civil to take a look at it but IMO the feed bin
>condition was worse for the slab than your proposed pump / storage
>building
>
>cheers
>Bob


Central Texas. I don't even insulate the water valves in the barn
lots. It gets cold occasionally but not for long. Bury water lines 8"
deep. No frost line.

The feed bin had been there over 20 years. No cracks or tilting of the
slab.

Thanks.
Andy Asberry

2005-09-28, 6:21 pm

On Wed, 28 Sep 2005 14:43:42 GMT, Bob Morrison <bob@
_remove_rlmorrisonengr.com> wrote:

>In a previous post Andy Asberry wrote...
>
>The answer depends on your location. If in a high seismic zone or an area
>where the frost depth is high then the 6" slab may not be sufficient.
>
>AS Bob K suggested, you might want to have an engineer take a quick look
>at the issue just to satisfy yourself that the structure will be safe.
>


No seismic or frost line here. There are many larger tanks around here
on 3" pipe stands (local description) with the legs in concrete. Some
a hundred years old.

Optional ideas:
I could reduce the size to put the walls over the piers. Tank
diameter is 78".
Maybe u lintels for the first course to create a beam above the
slab.
Set the tank on the slab and place the pump on an adjacent new
slab.
Demo this one and start over. Not likely. That would be a bear.
Build a pipe stand over/around the building to support the tank.

Bob, I want to take this opportunity to express the appreciation I
feel the group owes you. Sometimes, I wonder why you continue to try
to help so many who only want someone to agree with them. Unlike those
dummies, I will heed your advice. Thanks.
Bob Morrison

2005-09-28, 10:21 pm

In a previous post Andy Asberry wrote...
> No seismic or frost line here. There are many larger tanks around here
> on 3" pipe stands (local description) with the legs in concrete. Some
> a hundred years old.
>
> Optional ideas:
> I could reduce the size to put the walls over the piers. Tank
> diameter is 78".
> Maybe u lintels for the first course to create a beam above the
> slab.
> Set the tank on the slab and place the pump on an adjacent new
> slab.
> Demo this one and start over. Not likely. That would be a bear.
> Build a pipe stand over/around the building to support the tank.
>
> Bob, I want to take this opportunity to express the appreciation I
> feel the group owes you. Sometimes, I wonder why you continue to try
> to help so many who only want someone to agree with them. Unlike those
> dummies, I will heed your advice. Thanks.
>


Andy:

Thank for the compliment. I'm thinking that if could locate the center of
your new CMU walls at the outside edge of the piers then you should be
okay. I would be inclined to suggest that you add some vertical bars
doweled into the slab at 48" o/c and (2) #4 horizontal in a bond beam
blocks at every 48" o/c. You may want to grout the bottom two courses of
CMU solid and of course you would grout the cells that have vertical and
horizontal bars.

Your top slab should be at least 6" thick and have #3 or #4 12" o/c each
way.

Does that help? I still think a quick review by a local engineer would be
the best.

--
Bob Morrison, PE, SE
R L Morrison Engineering Co
Structural & Civil Engineering
Poulsbo WA
LinkBot





Other archives available: Cellular phones topics archive | Web Design forum archive | Software help archive | Hardware reviews archive | Programming topics archive

Copyright 2004 - 2008 homeownerschat.com